Artec Engineering were approached by a school to create a Time Capsule that students were to bury for 100 years, the materials used and Metal Welding applied were therefore crucial to ensuring the contents of the time capsule remained intact.
Using a very basic hand-drawn sketch from the customer, Artec developed the design hand in hand with them and commenced work.
Work started by Metal Spinning the two ends, then the Metal cylinder was fabricated. The flanges were then laser cut and welded to the assembly. The project was then completed with an industrial brush finish, specified by the customer so the capsule looked ‘industrial’,
The job took 1 week from start to finish and was delivered to the customer without issue.